Partners needed for a building project Design and furnishing for bars, restaurants and hotels
 

Photovoltaic power plant

building of energy park

Plant 3:

It is planned to be constructed solid supporting structure with dimensions 43.50mx11.60m. The angle of the construction is estimated to be 32˚.
The power plant will be made from 378 Solar Swiss SSM-170/24M panels. 9 invertors of the type Sunny Mini Central SMC 7000TL will be used. Under the contact with CEZ the produced energy will be distributed using low-voltage through the nearby-located electric transformer.
The total price of the plant will be 574889.18 levs VAT excluding.
The solar audit data shows that the average production is approximately 81.2 MW equating 1263 kW/kWp. At the current electricity prices the annual profit of the plant is 61 306 levs VAT excluding.

438 offers for business in Bulgaria

Quick search

Advanced search

Top offers

Plot of land with a project for a mini skyscraper in Sofia

Sofia

Plot of land with a project for a mini skyscraper in Sofia

Price: upon negotion

Sour cherry orchard farm for sale in Bulgaria

near Vidin

Sour cherry orchard farm for sale in Bulgaria

Price: 270 000 €